A solar installation is not complete when the panels are fixed to the roof. The quotation should explain the route from survey through grid notification or approval, commissioning and handover.
Grid connection
Your installer should explain which Distribution Network Operator serves the property and whether the system requires notification, prior approval or export limitation. Do not assume every design can export at its full rated output.
At handover
You should receive the final specification, commissioning information, electrical and product documentation, warranties, monitoring access and a route for faults or aftercare. Check what is included and excluded.
Ask before signing
- Who handles the DNO process?
- Is export limitation expected?
- What remains subject to survey or DNO approval?
- Which documents will I receive?
Use the Energy Networks Association connection guidance and confirm requirements with the relevant DNO.